Shelter Response Proposal Form
|
| What branch of the government or NGO is the ultimate purchaser ? |
|
| Email |
|
Occupation
|
| Number of Occupants |
|
| Mininum temperature during cold season (if applicable) |
|
| Deployment in |
Clustered Camps
Individually near homes/properties
|
| Heating or cooling required |
Yes
No
|
| Period of occupancy expected |
|
| Weather resistent-Max wind speed |
|
| Interior volume |
|
Production Rate
|
| Quanitty required |
|
| Time over which delivery is desired |
|
| Leadtime to regular deliveries |
|
| Delivery rate |
|
| Max Delivery rate |
|
Deployment Rate
Port to port of use still in container or broken down
|
| Assembly area required/availble |
Grassy fields
Asphalt parking lots
Sports fields
Ag fields
Other
|
| Who will Deploy |
Military
Civil Defence
NGO
Private
Contractor
Volunteers
Occupants
|
| Assembly crew required |
One crew produces as delivered
New crew to assemble each
|
| Assembly skills required |
|
| Assembly tools required |
|
| Availability of power |
|
| Camp density |
|
Product Options
|
|
Type 1 10*10 Wood Frame, no floor ,Plastic tunnel and end walls.Fold On site
Type 2 10*10 Plastic Tunnel fabric end walls, prefab deployment in 30 seconds.
Type 3 10*10 All Plastic. Pre-folded, assemble on site.
Type 4 11*14 Plastic Tunnel fabric end walls, prefab deployment in 30 seconds.
Type 4 11*14 Plastic Tunnel fabric end walls, Flod and assemble at point of use
|
| |